PROJECT DESCRIPTION
16 May 2013 – 15 March 2014
Design, Specification preparation and Cost estimate of the following systems
- 115 kV Transmission Line System
- Main Transformer Station 2 ( MTS 2 )
- 24 kV Power Distribution System and Power Cable Installation
- Indoor Substation and Unit Substation
- Modification to the existing 24 kV Power Distribution System
- Supervisory control and Data Acquisition (SCADA)
- Water System
- Waste Water System
- Waste Management System