SURVEY & DETAILED DESIGN AIRPORT

PROJECT

 


PROJECT DESCRIPTION

16 May 2013 – 15 March 2014

Design, Specification preparation and Cost estimate of the following systems

  •    115 kV Transmission Line System
  •    Main Transformer Station 2 ( MTS 2 )
  •    24 kV Power Distribution System and Power Cable Installation
  •    Indoor Substation and Unit Substation
  •    Modification to the existing 24 kV Power Distribution System
  •    Supervisory control and Data Acquisition (SCADA)
  •    Water System
  •    Waste Water System
  •    Waste Management System